FirefoxOS/FlyWeb
Jump to navigation
Jump to search

Program Description
The web already powers the world's email, media, shopping, and more. Interacting with these things is a breeze because they all use the web. What if the electronics around us were the same?
Meet FlyWeb. FlyWeb is a very simple idea at its core. Instead of phones interacting only with the cloud, they can discover and interact with electronics around them that are running empty web clients, such as TV's, projectors, game consoles, etc. The electronics come to life when connected to phones. The key here is that either the phones serve web apps to these electronics, or the electronics serve web apps to the phones.
For more information: https://wiki.mozilla.org/FlyWeb
Product Requirements:
User Stories and Acceptance Criteria
Coming soon!
Program Status
| Milestone | Date | Status |
|---|---|---|
| MozFest Demo | 11/6-7/2015 | DONE |
| Mozlando Demo | 12/7-11/2015 | DONE |
| Platform Development | 1/2016 | ON TARGET |
| Second Iteration of Development | 3/2016 | ON TARGET |
| Land on Masters | 6/2016 | ON TARGET |
| London All Hands Conference | 6/2016 | ON TARGET |
Status Key
| Color | Status | Key |
|---|---|---|
| On Target | The project or deliverable is expected to meet its due date. | |
| Challenged | The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track. | |
| At Risk or Late | The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late. | |
| Done | The project or deliverable has been completed. | |
| On Hold | The project or deliverable has been placed on hold. |
Program Timeline
MVP Scope
<bugzilla>
{
"blocks":"1228662",
"status":["NEW","REOPENED","UNCONFIRMED","ASSIGNED","RESOLVED","VERIFIED","CLOSED"],
"include_fields": "id, summary, status, target_milestone, resolution, assigned_to, depends_on, blocks, whiteboard, cf_feature_b2g"
}
</bugzilla>
Dependency Tracking
Coming Soon!
Detailed Program Plan
| Action Item | Engineering Owner | QA Owner | UX Owner | Bugzilla ID | Planned Done | Actual Done |
|---|---|---|---|---|---|---|
Program Stakeholders
| Role | Name | IRC |
|---|---|---|
| EPM | Nicole Yee | nicoleyee |
| EM | Jonas Sicking | sicking |
| PM | ||
| TL | Kannan Vijayan | djvj |
| UX | N/A | |
| QA | N/A |
- EPM = Engineering Program Manager
- EM = Engineering Manager
- PM = Product Manager
- TL = Tech Lead
- UX = User Experience
- QA = Quality Assurance
