RTL (Right to Left)

From New wiki
Jump to navigation Jump to search

Program Description

Implementing RTL support for basic scope 10 apps on FxOS 2.5:

  • System (includes task switcher and various UI panels)
  • Homescreen
  • Email
  • Dialer (callscreen)
  • Contacts (communications/contacts)
  • SMS
  • Browser/Search
  • FTU
  • Settings
  • Calendar

Program Status

App Dev Completed Test pass rate Test run Test case
Dialer / Callscreen ON TARGET 84% https://moztrap.mozilla.org/runtests/run/8153/env/347/ https://goo.gl/dPtqDw
FTU ON TARGET 56% https://moztrap.mozilla.org/runtests/run/8106/env/27835/ https://goo.gl/Cz713F
System ON TARGET 76.19% https://moztrap.mozilla.org/runtests/run/8152/env/347/ https://goo.gl/up61jP
SMS ON TARGET 85% https://moztrap.mozilla.org/runtests/run/8199/env/347/ https://goo.gl/eQSNWr
Homescreen ON TARGET 72.73% https://moztrap.mozilla.org/runtests/run/8106/env/27835/ https://goo.gl/CVpjxr
Browser ON TARGET 93.33% https://moztrap.mozilla.org/runtests/run/8285/env/347/ https://goo.gl/YWIad3
Emergency Call ON TARGET 100% https://moztrap.mozilla.org/runtests/run/8153/env/347/ https://goo.gl/CwNIgq
Settings ON TARGET 85.32% https://moztrap.mozilla.org/runtests/run/8202/env/347/ https://goo.gl/0kiS2I
Contacts ON TARGET 84.21% https://moztrap.mozilla.org/runtests/run/8286/env/347/ https://goo.gl/6xV4kq
Search ON TARGET 20% https://moztrap.mozilla.org/runtests/run/8200/env/347/ https://goo.gl/CrvLvz
Keyboard ON TARGET 100% https://moztrap.mozilla.org/runtests/run/8201/env/347/ https://goo.gl/5YuN1z
Calendar ON TARGET 76.47% https://moztrap.mozilla.org/runtests/run/8287/env/347/ https://goo.gl/i2XRdk
Email ON TARGET 86.36% https://moztrap.mozilla.org/runtests/run/8288/env/347/ https://goo.gl/vJfqzk

Status Key

Color Status Key
On Target The project or deliverable is expected to meet its due date.
Challenged The project or deliverable is facing an issue that might cause it to miss its due date, but a “get well” plan has been developed to get it back on track.
At Risk or Late The project or deliverable is blocked or facing an issue that might cause it to miss its due date, and there’s no “get well” plan to get it back on track, or it is already late.
Done The project or deliverable has been completed.
On Hold The project or deliverable has been placed on hold.

Program Timeline


MVP Scope

Meta: Bug 1202354 - (CSS_Refactor_2.5) CSS refactoring for Firefox OS 2.5

<bugzilla>

   {
       "blocks":[1202354],
       "cf_feature_b2g_type":"contains",
       "include_fields": "id, priority, component, assigned_to, summary, status, target_milestone"
   }

</bugzilla>


Program Stakeholders

Role Name IRC
EPM Josh Cheng JoshCheng
PM Wilfred Mathanaraj wilfred
TL Samuel Foster sfoster
UX Rob MacDonald robmac
QA William Hsu whsu
  • EPM = Engineering Program Manager
  • EM = Engineering Manager
  • PM = Product Manager
  • TL = Tech Lead
  • UX = User Experience
  • QA = Quality Assurance

UX Specs

Reference Links